San Martin Construction Update – June 3, 2016

  • San Martin Drive closures remain in place.  A flagger continues to be posted at the San Martin Center to assist motorists.
  • South bridge steel and abutment have been completed.  The north side steel erection will begin the week of Jun 6.  Precast concrete bridge deck planks are onsite.
  • Installation of granite pavers for the Bowman Drive intersection will be completed this weekend.  Brick walkways are continuing to be installed throughout the project length.
  • Work on the retaining wall between the new bridge and San Martin Center continues, with the wall coming up to subgrade elevation next week.
  • Electricians are continuing to work on the installations of light poles beginning this week.
  • Granite paver installation is expected to occur at the Bowman Drive/West Gate intersection this Saturday, June 4.
 
 
 